+92-334-0001334 wasajhelum@gmail.com
Downloads

New Connection Application

Download the application form for new water supply and sewerage connections. Please ensure you complete all required fields and submit the form along with the necessary documents to our customer service center.

Water / Sewerage Connection Application Form

Word Document (.docx)

This form is required for applying for a new water supply / sewerage connection to your property. The form includes sections for applicant's personal information, property details, type of connection required, payment information, and terms and conditions.

Application Process

Steps to Apply for a New Connection

  1. Download and Fill the Form

    Download the appropriate form (water supply or sewerage) and fill in all required information accurately.

  2. Gather Required Documents

    Collect all necessary supporting documents as mentioned in the checklist below.

  3. Pay Application Fee

    Pay the application processing fee at any designated bank or online through our payment portal.

  4. Submit Application

    Submit the completed form along with supporting documents and payment receipt to our customer service center.

  5. Site Inspection

    Our technical team will conduct a site inspection to assess feasibility and connection requirements.

  6. Approval and Payment

    Upon approval, you will receive a demand notice for connection charges. Make the payment within the specified time.

  7. Connection Installation

    After payment confirmation, our team will schedule and complete the connection installation.

Required Documents Checklist

Document Residential Commercial
Completed Application Form
Copy of CNIC
Property Ownership Proof
Site Plan/Map
Building Approval Plan
Previous Utility Bills (if any)
Business Registration Certificate
NOC from Environmental Department
Application Fee Receipt
Passport Size Photographs 2 2
Connection Charges
Domestic
Sr.No Category Water Sewerage Total
11 Marla to 10 Marla80012002000
211 Marla to 20 Marla120020003200
320 Marla to Above120030004200
Commercial
Sr.No Category Water Sewerage Total
11 Marla to 10 Marla100040005000
211 Marla to 20 Marla200060008000
320 Marla to Above2000800010000
Industrial
Sr.No Category Water Sewerage Total
11 Marla to 10 Marla10001000011000
211 Marla to 20 Marla20001200014000
320 Marla to Above20001400016000
Plaza
Sr.No Category Water Sewerage Total
11 Marla to 10 Marla1000010000
211 Marla to 20 Marla2000020000
321 Marla to 30 Marla3000030000
4Above 30 Marla5000050000
Disconnection and Reconnection Fee
Sr.No Category Existing Disconnection / Reconnection Revised Disconnection Fee Revised Reconnection Fee
1Domestic200500500
2Commercial20010001000
3Industrial20020002000

Frequently Asked Questions

The standard processing time for a new connection application is 15-20 working days from the date of submission of a complete application with all required documents. This includes:

  • Application review: 3-5 days
  • Site inspection: 5-7 days
  • Approval and demand notice generation: 2-3 days
  • Connection installation after payment: 5-7 days

Processing times may vary based on the complexity of the connection and current workload.

Yes, you can apply for both water supply and sewerage connections simultaneously. In fact, we recommend this approach as it streamlines the process and may reduce overall costs. You will need to:

  • Fill out both application forms
  • Submit a single set of supporting documents (no need to duplicate)
  • Pay the application fees for both services

Our team will coordinate the site inspection and installation for both services to minimize disruption.

If WASA main lines (water supply or sewerage) are not available in close proximity to your property, the following options are available:

  1. Extension of Main Line: You can apply for an extension of the main line to your area. This involves additional costs and requires approval based on technical feasibility.
  2. Community Application: You can coordinate with neighbors to submit a collective application for main line extension, which may reduce per-household costs.
  3. Development Scheme: Your area may be included in upcoming development schemes. You can check with our Planning Department for information on future expansion plans.

Each case is evaluated individually based on distance, technical feasibility, and cost considerations.

No, all connection work from WASA main lines to the property boundary must be carried out by WASA authorized personnel only. This ensures:

  • Compliance with technical specifications and standards
  • Proper documentation and mapping of connection points
  • Prevention of damage to existing infrastructure
  • Quality assurance and warranty for the connection work

However, internal plumbing work within your property boundary can be done by private contractors of your choice, provided they follow the building codes and standards.

WASA Jhelum offers several payment options for connection charges:

  • Bank Deposit: Direct deposit at designated bank branches
  • Online Banking: Transfer through internet banking
  • Mobile Banking: Payment through mobile banking apps
  • Cash Payment: At WASA Jhelum customer service centers
  • Installment Plan: For connections with high charges (subject to approval)

The demand notice issued after application approval will contain detailed payment instructions and options.

Need Assistance?

Our support team is ready to help you navigate the connection process.

Call Us
042-111-WASA-J (111-927-25)
Email Us
info@wasajhelum.gov.pk